Checked
Building permits for decks, sheds, fences and pools in Surrey, British Columbia
Surrey, British Columbia, Canada
When Surrey, British Columbia homeowners need a building permit for a deck, shed, garage, fence, pool or hot tub, what to submit and the upfront fee.
Key information
In Surrey you usually need a building permit for a deck, a garage or accessory building, and a pool of 14 m2 or more that is at least 450 mm deep. Fences and small sheds of 10 m2 or less (set 1.5 m from property lines and 3 m from other buildings) do not need a building permit, but must still meet the zoning bylaw.

On this page
Do I need a permit?
| Project | Building permit? | Key rule |
|---|---|---|
| Fence | No | Must follow Zoning By-law 12000 and sit on your own property |
| Storage shed 10 m2 or less | No | At least 1.5 m from property lines and 3.0 m from other buildings |
| Larger shed, garage or accessory building | Yes | Detached Garage or Accessory Building Permit |
| Deck added to a house | Yes, in most cases | Deck Permit |
| Pool 14 m2 (150 ft2) or more and 450 mm (18 in.) or deeper | Yes | Swimming Pool Permit and a pool fence |
| Hot tub | Listed by the City as needing a permit | Swimming Pool Permit |
| Flooring, minor exterior repairs | No | No permit needed |
| Plumbing or electrical work | Separate trade permit | Apply after the building permit is issued |
Sources: Residential Building Permits | City of Surrey · Swimming Pool Permit | City of Surrey
What do I submit for a deck permit?
Submit by email or in person. The Trees and Landscape team also reviews deck applications for tree protection. Keep the approved drawings on site during construction.
- Building Permit Application Form.
- A current Title Search of the property.
- Owner Authorization Form if you are not the registered owner.
- Drawings: site plan, foundation plan, floor plan, cross section and elevations. Paper must be at least 11 x 17 inches (24 x 36 preferred). No pencil, colour ink, graph paper, blueprint paper or laminated sheets.
- The permit fee.
Sources: Deck Permit | City of Surrey
What are the rules for pools and sheds?
A pool and the area around it must be inside a non-climbable fence with a self-closing, self-latching, lockable gate under the Surrey Private Swimming Pool Fencing Bylaw No. 4450. A pool cover does not replace the fence. In-ground pool plans must be sealed by a BC professional engineer, and a shed holding pool equipment needs its own building permit.
A shed without a permit must still follow the zoning bylaw for use, density, lot coverage, setbacks and height. A single light and switch in a shed can go under the house electrical permit; any more wiring needs a separate electrical permit.
Fences cannot be built on City property, a City right-of-way or an easement. The City does not settle fence disputes between neighbours.
Sources: Swimming Pool Permit | City of Surrey · Residential Building Permits | City of Surrey · Detached Garage or Accessory Building Permit | City of Surrey
What does the permit cost up front?
| Declared value of construction | Initial payment |
|---|---|
| $0 to $19,999 | $50 |
| $20,000 to $99,999 | $150 |
| $100,000 to $999,999 | $700 |
| $1,000,000 to $4,999,999 | $5,500 |
| $5,000,000 and over | $25,000 |
The rest of the permit fee is due before the permit is issued. Fees can be paid by cash, cheque or debit, and by credit card up to $15,000.
Sources: Building Permit Fees & Fee Estimator | City of Surrey
Questions and answers
Do I need a permit for a fence in Surrey?
No building permit is needed, but the fence must meet Zoning By-law 12000 and be on your own property.
How big can a shed be without a permit?
10 m2 or less, placed at least 1.5 m from property lines and 3.0 m from other buildings on the lot.
Do I need a permit to build a deck?
In most cases, yes. A deck added to a house needs a building permit.
Source: Deck Permit | City of Surrey
When does a pool need a permit?
When it has a surface area of 14 m2 (150 ft2) or more and is 450 mm (18 inches) or deeper.
Does my pool need a fence?
Yes. A non-climbable fence with a self-closing, self-latching, lockable gate is required. A pool cover is not enough.
What paper size do drawings need?
At least 11 x 17 inches, with 24 x 36 inches preferred.
Source: Deck Permit | City of Surrey
How much do I pay when I apply?
A non-refundable processing fee based on project value: $50 under $20,000 and $150 for $20,000 to $99,999.
Source: Building Permit Fees & Fee Estimator | City of Surrey
Can I pay permit fees by credit card?
Yes, up to $15,000. Cash, cheque and debit are also accepted.
Source: Building Permit Fees & Fee Estimator | City of Surrey
Do I need separate electrical and plumbing permits?
Yes. Apply for them after the building permit is issued.
Who do I call if I am not sure I need a permit?
The Building Information Line at 604-591-4366.
Official permit pages
- Residential Building Permits | City of Surrey
- Deck Permit | City of Surrey
- Swimming Pool Permit | City of Surrey
- Detached Garage or Accessory Building Permit | City of Surrey
- Building Permit Fees & Fee Estimator | City of Surrey
Sources: Residential Building Permits | City of Surrey · Deck Permit | City of Surrey · Swimming Pool Permit | City of Surrey · Detached Garage or Accessory Building Permit | City of Surrey · Building Permit Fees & Fee Estimator | City of Surrey